Patch Set 25 for Oracle® Primavera P6 EPPM is available for download at My Oracle® Support. The patchset contains all patches from previous service packs and patchsets. Requirement for installing this patchset is an existing version of P6 EPPM 18.8.0 or higher.

The patchset is certified for JDK 1.8.0_181. Other supported JDK-versions are listed within the Tested Configurations.

Version

Component

Bug ID

Title

18.8.25.0

WEB

33440174

P6WEB EPS VIEW DOES NOT SHOW EMPTY EPS NODES WHEN FILTER IS APPLIED

33433103

BP - CURRENT DURATION FIELD EXPORTED TO IPMDAR ARE NOT CORRECT

33433089

BP : EARNED VALUE TECHNIQUE ID NOT EXPORTING TO IPMDAR JSON AS EXPECTED

33424794

UNABLE TO LOAD DATA' ON P6 WEB ACTIVITIES VIEW

33570089

IPMDAR ISSUES - BASELINE DURATION SHOULD BE NULL FOR NON MATCHING ACTIVITY

TM

33564077

CREATING A TIMESHEET USING COPY ACTIVITIES FROM PREVIOUS TIMESHEET DOES NOT RECOGNIZE ADDITION OF ACTIVITIES AS AN UPDATE PREVENTING DISPLAY OF SAVE/CANCEL PROMPT WHEN USING SORT BY = ACTIVITY ID

33517126

TEAM MEMBER LOGIN EXCEPTION ACCESSOR OR ITS CONNECTION HAS BEEN SET TO NULL.

33492434

FP TEAM MEMBER MANAGED SERVER(S) JVM PROCESS CONSUMING HIGH CPU AND MEMORY - CLEARENTITYMANAGER CHANGES

33492393

FP TEAM MEMBER BAD PERFORMANCE - DAOACCESSADVICE AUDIT CHANGES

33453652

FP - TIMESHEET SUBMISSION ERROR - TOTAL HOURS CANNOT EXCEED 24 HOURS PER DAY

33360257

STATUS UPDATES FOR REMAINING DURATION AND PERCENT COMPLETE RESETS ORIGINAL DURATION

33251771

FP - USERS ABLE TO LOGIN INTO TM ONLY IF TM AND TS MODULE ACCESS ARE ENABLED IN 18.8.24.0

SRVS

33377638

FP P6 SERVICES SCHEDULING LOGIC CAN SET WBS SUMMARY ACTIVITIES TO AN IN-PROGRESS STATUS WITHOUT AN ACTUAL START DATE

33273425

FP PRIMAVERA WEB SERVICES SYNCHRONIZATION ERROR

INTG

33186594

WHEN LOADING ACTIVITES USING P6 API ALL TASKRSRC FOR THE PROJECTS ARE LOADED DURING EACH BATCH

API

26268837

VERSIONINFO CLASS IS NOT PROPERLY REPORTING THE API VERSION

P6PRO

33436497

ABILITY TO DELETE THE GLOBAL DEFAULT CALENDAR WITHIN P6 PROFESSIONAL WHILE ATTEMPTING TO DELETE UNASSIGNED PROJECT LEVEL CALENDAR

33304212

ACTIVITY USAGE SPREADSHEET PASTED INTO EXCEL DISPLAYS DATES BACK TO 00

33075059

CONVERT ANOTHER PROJECT SELECTION FOR BASELINES DEFAULTS TO TOP EPS NODE

32606063

VERTICAL SIGHT LINES ARE PLACED BETWEEN WEDNESDAY AND THURSDAY AFTER SETTING SHOW MAJOR LINES EVERY TO 7 DAYS

33477376

EXTREMELY POOR PERFORMANCE WHEN EXECUTING GLOBAL CHANGE

33463513

IPMDAR EXPORT: TASK FIELDS ARE NOT EXPORTED IN TASKS.JSON FILE

33426620

EARNED VALUE TECHNIQUE ID NOT EXPORTING TO IPMDAR JSON AS EXPECTED FROM P6PRO FOR EPPM

33212815

CSTR_DATE: INVALID VALUE OR DATA TYPE MISMATCH ERROR WHEN TRYING TO IMPORT XLSX FILES IN P6 PROFESSIONAL

32943426

IN P6 PROFESSIONAL ACTIVITIES LAYOUT IF GROUP AND SORT IS PRIMARY RESOURCE ANY COLLAPSED NODES ARE UNEXPECTEDLY EXPANDED AFTER LAYOUT SAVE OR SAVE AS

32906165

BUDGETED COST IS NOT CORRECTLY CALCULATED FOR SMALL VALUES FOR BUDGETED UNITS/TIME SEV 1 SR

32801522

MISSING PARAMETER CRITERIA WHEN FILTERING PROJECTS

32758010

IMPORT / EXPORT REMAINING LAG FROM XLS DOESN'T WORK

32978050

WHEN TRYING TO EXPORT SCHEDULE WITH ALL PROJECT LEVEL LAYOUT ERROR FILE NOT FOUND ON SERVER

32611599

EXPORT TO XSLX INCREASES FROM 3 MINUTES TO 4 HOURS WHEN ADDING PROJECTS CODES TO THE EXPORT

proadvise GmbH l Brühlweg 4 l 73663 Berglen

Newsletter

Register here for our newsletter and secure your knowledge advantage!

Register now

Copyright © 2020 proadvise.com - All rights reserved.
Design and programming webart-IT UG (haftungsbeschränkt)