Patch set 2 for Oracle Primavera P6 EPPM R21.12 is available for download from My Oracle Support. The patch set contains the patches from the previous service packs and patch sets. Prerequisite for the installation of the service packs is at least version P6 EPPM R21.12.0 or higher.

The patch set is certified for the JDK 1.8.0_311 Further supported JDK versions can be found in the Tested Configurations.

Version

Component

Bug ID

Title

21.12.2.0

WEB

33823000

FP - WHY ARE THE PRIVILEGES REQUIREMENTS DIFFERENT BETWEEN CLIENT AND WEB WITH REGARD TO COPYING A READ-ONLY PROJECT?

33817665

FP - ACTIVITY PAGE GRIDDATA/LOAD STATEMENT LOADING PROJECTS WITH TWO TASK TABLE SUBQUERIES CAUSING PERFORMANCE DEGRADATION

33813108

FP - DIFFERENT RESOURCE MANAGER CAN APPROVE TIMESHEET BY SWITCHING VIEWS IN APPROVAL PAGE

33799002

21 FP - DELETED RELATIONSHIPS REAPPEAR AFTER RELATIONSHIP CHANGES SAVED

33794393

MSP PROJECTS IMPORT INTO P6 WITH PERCENT COMPLETE TYPE SET TO PHYSICAL EVEN THOUGH IT IS SET TO DURATION ( % COMPLETE) IN MSP

33794370

RISK RESPONSE PLAN WILL NOT STAY ACTIVE

33794344

TIMESHEET TOTALS IN P6 WEB NOT SHOWING TOTALS FOR FIRST OR LAST DAY OF TIMESHEET PERIOD

33787780

21 FP - DUPLICATE PROJECT CODES WHILE IMPORTING XML USING NEW NAME FEATURE IN IMPORT TEMPLATE

33780137

PROJECT CODE VALUES BLANK WHEN MULTIPLE PROJECTS OPENED IN EPS PAGE

33765614

FULL PATH NAME IN RESOURCEHIERARCHY TABLE ARE NOT CORRECT

33751376

REG-FILLDOWN AN EMPTY VALUE WITHOUT SAVING IS NOT HAPPENING

33730716

[JAVASCRIPT] ACTIVITY PAGE LOADING DELAY WITH VIEW USING WBS GROUPING AND PROJECT WITH HUGE VOLUME OF WBS ELEMENTS

33797582

ACTIVITY LEVEL PROJECT SECURITY PRIVILEGE 'DELETE DISCUSSION COMMENTS' IS NOT EXPOSED IN P6 WEB SERVICES

33730609

ORPM_ADMUSER_UPGRADE.SQL CAN FAIL WITH ORA-00439: FEATURE NOT ENABLED: ONLINE INDEX BUILD WHEN RUN AGAINST AN ORACLE STANDARD EDITION DATABASE

TM

33788481

BASELINE DATES DON'T SHOW IN TIMESHEETS FOR ACTIVITIES THAT WERE AUTOMATICALLY ADDED

SRVS

33763857

FP - CUSTOMER WIPED PAUDITX BUT WHEN AUDIT DATA IS REPUBLISHED IT ONLY TOOK AUDIT DATA FROM THE DAY OF THE REPUBLISH

P6PRO

33844667

P6 PROFESSIONAL LINK TO UNIFIER THROWS ERROR 'NF(-'-3940-8 NOT FOUND (404)

33667966

THE 'ACTIVITY RESOURCE ASSIGNMENTS' STAGE OF AN XER IMPORT TAKES ABOUT 80% OF THE TOTAL IMPORT TIME.

33654104

ROW HEIGHT CHANGES NOT WORKING CORRECTLY.

proadvise GmbH l Brühlweg 4 l 73663 Berglen

Newsletter

Register here for our newsletter and secure your knowledge advantage!

Register now

Copyright © 2020 proadvise.com - All rights reserved.
Design and programming webart-IT UG (haftungsbeschränkt)