Patch Set 8 for Oracle Primavera P6 EPPM R20.12

Patch Set 8 for Oracle Primavera P6 EPPM R20.12

| released in Support

Patch set 8 for Oracle Primavera P6 EPPM R20.12 is available for download from My Oracle Support. The patch set contains the patches from the previous service packs and patch sets. Prerequisite for the installation of the service packs is at least version P6 EPPM R20.12.0 or higher.

The patch set is certified for the JDK 1.8.0_271 Further supported JDK versions can be found in the Tested Configurations.

Version

Component

Bug ID

Title

20.12.8.0

WEB

33149547

INTERNAL-FP:[SQL SERVER] SELECTING A PARENT CODE VALUE ONLY LOADS RESOURCE DATA FOR IMMEDIATE CHILD CODES VALUES ON THE RESOURCE > ANALYSIS PAGE GROUPED BY RESOURCE CODE

33146020

VIEW SERVICE STATUS IMPORT JOB PROJECTS COLUMN SHOWING IMPORTING EPS NAME RATHER THAN THE IMPORTED PROJECTS NAME.

33141555

RESOURCE ASSIGNMENTS VIEW DOES NOT LOAD

33123131

FP - [SQL SERVER] RESOURCE > ASSIGNMENTS PAGE INCORRECT EXECUTES SECOND TASKRSRC STATEMENT WHEN FIRST STATEMENT MATCHES OR EXCEEDS DATA LIMIT AND VIEW CONTAINS UDF OR CODE

33085632

ERROR INVALID PATH WAS REQUEST WAS RECEIVED WHEN TRYIN TO LOGIN IN P6 WEB

33036441

GLOBAL CALENDARS ARE NOT SORTING PROPERLY IN ENTERPRISE DATA

33164010

FP - P6 RESOURCEASSIGNMENT SERVICE ALWAYS RETURNS PRICEPERUNIT AS NULL VALUE FOR A ROLE

33124852

ERROR: JAVA.LANG.NUMBERFORMATEXCEPTION: NULL WHEN LOADING RELATIONSHIPS USING ACTIVITY CLASS.

32999690

EPS IS UNDER FILTER FOR PORTFOLIOS CAUSES AN ERROR

32671449

FROM P6 UN/CEFACT XML EXPORTS BLANK EARLY START, EARLY FINISH, LATE START, AND LATE FINISH DATES WHEN ACTUAL DATES EXIST FOR LOE & WBS SUMMARY TYPES

32559858

RESOURCE ANALYSIS PAGE TAKES OVER 1 MINUTE TO LOAD

33066149

CHANGE ERROR RETURNED WHEN SUMMARIZING PROJECT WITH NO CALENDAR ASSIGNED

33167149

IN P6 WEB IF A USER IS ASSIGNED A UIV THAT DOES NOT ALLOW ACTIVITY UDF EDITING THE UIV USER IS STILL ABLE TO EDIT THE UDF ON THE LOWER UDF TAB

33130147

SERVICE STATUS PAGE IN P6 IS UNABLE TO LOAD - GETTING AN ERROR

TM

33160145

AFTER UPGRADE TEAM MEMBER IS TAKING THREE MINUTES TO OPEN THE PAGE

CLOUDCONN

32986124

CLOUDCONNECT DOES NOT SYNCHRONIZE DATA

P6PRO

33102367

CURTAINS ATTACHMENT NOT PRINTING OVERLAP IN PDF OR PRINT PREVIEW

32818318

P6 SHOWS NOT RESPONDING FOR 8-12 MINUTES WHEN ASSIGNING BASELINES

33124349

IN P6 PRO DURING XER IMPORT IF A NON-DEFAULT IMPORT TEMPLATE IS SELECTED TO USE IT'S SELECTION IS NOT SAVED OFF.

33105897

IN P6 PROFESSIONAL 'STATUS' VALUE IS MISSING FROM THE GROUP BY PICKLIST AND DOES NOT PRE POPULATE THE 1ST GROUP BY ROW WHEN CHOSEN

33104535

P6 VISUALIZER SCHEDULE COMPARISON IS NOT WORKING

33103928

ERROR: EVENT CODE: RRAGC-0089-9 WHEN LEVELING PROJECT

33037753

WBS ELEMENTS ARE NOT COPYING WPS & DOCS WITH ACTIVITES BETWEEN PROJECTS WHEN THAT OPTION IS SELECTED

32779443

CORRUPTED BASELINES CREATED INTERMITTENTLY

32617682

FROM P6 UN/CEFACT XML EXPORTS BLANK EARLY START, EARLY FINISH, LATE START, AND LATE FINISH DATES WHEN ACTUAL DATES EXIST FOR LOE & WBS SUMMARY TYPES

31704565

UNABLE TO LOCK PROJECT AT REQUESTED ACCESS LEVEL WHEN IMPORTING MSP XML FILE TO UPDATE AN EXISTING PROJECT

33202099

SCHEDULE PROJECT SLOW PERFORMANCE IN 20.12.7

32955489

XML IMPORT FAILS TO IMPORT TO SQL SERVER PPM DATABASE

33028808

WEBSERVICE FILTER LASTPUBLISHEDON

proadvise GmbH l Brühlweg 4 l 73663 Berglen

Newsletter

Register here for our newsletter and secure your knowledge advantage!

Register now

Copyright © 2020 proadvise.com - All rights reserved.
Design and programming webart-IT UG (haftungsbeschränkt)