Patch set 4 for Oracle Primavera P6 EPPM R20.12 is available for download from My Oracle Support. The patch set contains the patches from the previous service packs and patch sets. Prerequisite for the installation of the service packs is at least version P6 EPPM R20.12.0 or higher.

The patch set is certified for the JDK 1.8.0_271 Further supported JDK versions can be found in the Tested Configurations.  

Version

Component

Bug ID

Title

20.12.4.0

WEB

32698883

FP - VIEW GROUPING DIFFERENT BETWEEN VERSION 19 AND VIEW FROM VERSION 16

32693847

INCOMPLETE URL REFER TO YOUR WELCOME EMAIL FOR THE URL IN DASHBOARD-RISKS TAB

32673711

20FP - IN P6 WEB IF THE USER EDITS THE DURATION FORMAT FROM DAY TO HOUR THIS CHANGES THE ASSIGNMENT'S PRICE / UNIT ($8.00/D) TO $1.00/H

32643657

20 BP - ACTIVITY AND EPS VIEW THEME SETTINGS DO NOT SAVE (CUSTOM COLORS)

32642689

DASHBOARD PORTFOLIO VIEW SCORECARD PORTLET PERFORMANCE PERCENT COMPLETE NOT SUMMARIZING AS EXPECTED

32641922

REPETITIVE SQL EXECUTED ONE TIME PER PORTFOLIO DEGRADING OVERALL PERFORMANCE LOADING 'MANAGE PORTFOLIO' WINDOW

32636719

FP - TIMESHEET APPROVAL TAKES TOO LONG TO LOAD AND BECOME UNRESPONSIVE

32630562

FP DIFFERENT BEHAVIOR IN PRO CLIENT / WEB WHEN CHANGING START DATE ON ACTIVITY

32622727

FP - ADD/EDIT/DELETE RESOURCE ASSIGNMENTS FOR RESOURCE PLANNING STILL DISPLAYS IN ASSIGNED PRIVILEGES COLUMN AFTER UPGRADE

32612956

OUTPUT FORMAT DROPDOWN IS BLANK IN P6 FOR SPECIFIC REPORT TEMPLATE

32607435

COPY PROJECT TO CREATE NEW PROJECT- DOES NOT USE PROJECT PLANNED START DATE FOR NEW PROJECT

32603405

RESOURCE SEARCH DOES NOT WORK FROM OPEN REQUESTS FOR RESOURCES PORTLET IN DASHBOARD

32591330

FP - P6 EPPM MIGRATE.BAT LOGFILE - LOG LEVEL

32576631

FILTER CRITERIA CHANGING UNDER MANAGE PORTFOLIOS

32487403

FP - MIGRATING LARGE DATABASE - MIGRATE TOOL HANGS - DOES NOT LAUNCH

TM

32654823

GROUPING ACTIVITIES BY WBS IN TEAM MEMBER NOT CORRECTLY DONE

32642884

ERROR DATE OR UNIT FORMAT SPECIFIED WAS INVALID OR MISSING WHEN TRYING TO UPDATE ACTIVITY STATUS USING EAMIL STATUSING SERVICE

SRVS

32712018

FP PROJECT CODE/UDF ASSIGNMENTS GET MISSING AFTER IMPORTING XML FILE

32622550

20FP - P6 SERVICES SCHEDULING LOGIC CAN SET WBS SUMMARY ACTIVITIES TO AN IN-PROGRESS STATUS WITHOUT AN ACTUAL START DATE

32564695

FP- TASK_COPY_PKG.TASKPRED_COPY PACKAGE PROCEDURE CAN RUN SLOWLY WHEN OPTIMIZER USES HASH JOIN

32574050

STATUS REVIEWER IN PROJECT SERVICE CANNOT BE SET

INTG

32647746

FP - PRIMAVERA GATEWAY RESOURCE ASSIGNMENT UPDATE ISSUE

32694830

FP - ERROR ILLEGAL CHARACTER ((CTRL-CHAR, CODE ##)) INVOKING THE IMPORTSERVICE USING ZIP FORMAT WHEN PROJECT DATA INCLUDES CERTAIN UNICODE DASH CHARACTERS

32635938

FP FOR BUG 32469119 - ERROR ILLEGAL CHARACTER ((CTRL-CHAR, CODE ##)) INVOKING THE IMPORTSERVICE USING ZIP FORMAT WHEN PROJECT DATA INCLUDES CERTAIN UNICODE CHARACTERS

P6PRO

32662702

CHANGING ACTIVITY CALENDAR TO A CALENDAR WITH NON-WORK TIME CAUSES RESOURCE ASSIGNMENT DURATION TO SET TO 0

32650039

THE CONVERSION OF A VARCHAR DATA TYPE TO A DATETIME DATA TYPE RESULTED IN AN OUT-OF-RANGE VALUE

32606566

ACTIVITIES ARE MOVED TO AN EPS FROM ITS ORIGINAL WBS NODE AFTER MODIFYING THE ACTIVITY RELATIONSHIP

32606334

WHEN ASSIGNING RELATIONSHIPS, FOCUS MOVES TO ASSIGNED ACTIVITY

32605057

CHOOSING CUSTOM DATE FOR PAGE SETUP TIMESCALE DIRECTS TO YEAR 1899

32598730

P6 CLIENT LOGIN FAILING WITH ERROR 'UNABLE TO CONNECT DATABASE'

32565894

NOTEBOOK TOPIC DISPLAYS TEXT AFTER APPLYING FILTER, THEN OPENING UP A DIFFERENT PROJECT

32648631

RESOURCE ASSIGNMENT LAYOUT SHOWS DASHES INSTEAD OF NUMBERS AT SUMMARY LEVEL WHEN PRINTING

32618834

INDICATOR ICON IN COLUMN NOT DISPLAYING CORRECTLY

32617682

FROM P6 UN/CEFACT XML EXPORTS BLANK EARLY START, EARLY FINISH, LATE START, AND LATE FINISH DATES WHEN ACTUAL DATES EXIST FOR LOE & WBS SUMMARY TYPES

32591422

P6 PRO AND P6 WEB INVALID RELATIONSHIP TYPES

32586297

ERROR SAVING MODIFIED UN/CEFACT XML TEMPLATE <DATE>T<TIME> IS NOT A VALID DATE/TIME VALUE

32532931

UNABLE TO RUN P6 PROFESSIONAL REPORTS IN PRODUCTION

32517551

ACTIVITY CODE ASSIGNMENT/REMOVAL ISSUE

32108186

P6 PROFESSIONAL VIA CLOUDCONNECT: UNABLE TO CONNECT TO THE DATABASE. PLEASE RUN THE DATABASE CONFIGURATION TOOL OR CONTACT YOUR ADMINISTRATOR.

32652945

IMPORTING XER FILE TRUNCATES FRONT OF NAME

32604136

EXPORT LAYOUT FROM VISUAIZER FAILS WHEN THE LAYOUT NAME CONTAINS A FORWARD OR BACKWARD SLASH

proadvise GmbH l Brühlweg 4 l 73663 Berglen

Newsletter

Register here for our newsletter and secure your knowledge advantage!

Register now

Copyright © 2020 proadvise.com - All rights reserved.
Design and programming webart-IT UG (haftungsbeschränkt)