Patch Set 11 for Oracle Primavera P6 EPPM R22.12

Patch Set 11 for Oracle Primavera P6 EPPM R22.12

| released in Support

Patch Set 11 for Oracle Primavera P6 EPPM R22.12 is available for download from My Oracle Support. The patch set contains the patches from the previous service packs and patch sets. Prerequisite for the installation of the service packs is at least version P6 EPPM R22.12.0 or higher.

The patch set is certified for the JDK 1.8.0_311 Further supported JDK versions can be found in the Tested Configurations.

Version

Component

Bug ID

Title

22.12.11.0

WEB

35996261

CANNOT VIEW COSTS FOR RESOURCES/RESOURCE TEAMS IN RESOURCE ANALYSIS

35994384

NONLABOR RESOURCE EOC DATA NOT EXPORTING CORRECTLY WHEN EXPORTING TO DOE-CPP

35918180

PAGE BUSY WHEN EXPANDING RESOURCE IN RESOURCES ANALYSIS

35913493

PERFORMANCE ISSUE LOADING ACTIVITIES PAGE WHEN VIEW INCLUDES ACTIVITY CODE FILTER

35912229

FP - 22.12.X - BUG 35623421 - PUBLISHED RESOURCE ASSIGNMENT DATA AT DATABASE LEVEL DOES NOT MATCH P6

35908251

FP - EPS/PROJECT PAGE PAGINATION ISSUE

35876780

BP - SQL SERVER -LAST MODIFIED BY/DATE FIELDS IN RESOURCE ADMINISTRATION CONTAIN THE USER AND DATE THAT RAN SUMMARIZE PROJECTS

35719416

PERFORMANCE DEGRADATION LOADING ACTIVITY PAGE WHEN ACTIVITY CODE ADDED TO GRID

SRVS

35933260

[FORWARD PORT] COPY EPS GENERATES EPS CODE DUPLICATES IN P6 WEB

35806767

[SQL SERVER] SLOW PERFORMANCE OF PROJECT COPY/PASTE WHEN INCLUDING BASELINES (PROJECT_COPY_BASELINE CAN BE SLOW)

35592329

WHEN DELETING RESOURCE ASSIGNMENTS USING P6 WS ACTIVITY UNITS ARE SET TO ZERO

P6PRO

35958417

PROJECT-SCOPE CALENDARS OF THE PROJECTS THAT ARE NOT OPENED SHOW IN CALENDAR PICKER OF FILTERS

35957556

COPY RESOURCE USAGE SPREADSHEET FAILS WITH EVENT ERROR VTFIO-3175-F WHEN GROUPED BY RESOURCE CODE

35785968

IMPORT XLS CONSUMES MEMORY

35208174

THE FONT CUSTOMIZED IN PM.INI DOES NOT TAKE EFFECT

35992842

INTERNAL-FP SLOW PERFORMANCE AND PROGRAM CRASHES WORKING IN P6 PROFESSIONAL

35957561

POOR PERFORMANCE WHEN OPENING MULTIPLE PROJECTS WITH CERTAIN LAYOUTS IN P6 PRO

35957547

JOB STATUS NOTIFICATIONS CONTINUE ENDLESSLY AFTER WINDOWS PATCH

35947523

WHEN NAVIGATING TO TOOLS > PUBLISH > ACTIVITY LAYOUT, THE DIALOG PAGE DOES NOT OPEN.

35894594

ONLY THE GLOBAL DEFAULT CALENDARS MOVED WHEN MOVE TO PROJECT IN ADVANCED IMPORT OPTIONS FOR CALENDARS IN XML IMPORT TEMPLATE SELECTED

35791529

COPY PROJECT FAILS WHEN PROJECT ID HAS A DASH AND ENDS WITH A PERIOD

35746952

P6 PROFESSIONAL CLIENT REVERTS BACK TO THE PERVIOUS HORIZONTAL SPLIT BAR DIVIDER POSITION AFTER MINIMIZING P6 PROFESSIONAL OR ALT-TABBING AWAY AND BACK AGAIN

proadvise GmbH l Brühlweg 4 l 73663 Berglen

Newsletter

Register here for our newsletter and secure your knowledge advantage!

Register now

Copyright © 2020 proadvise.com - All rights reserved.
Design and programming webart-IT UG (haftungsbeschränkt)