Patch Set 11 for Oracle Primavera P6 EPPM R21.12

Patch Set 11 for Oracle Primavera P6 EPPM R21.12

| released in Support

Patch Set 11 for Oracle Primavera P6 EPPM R21.12 is available for download from My Oracle Support. The patch set contains the patches from the previous service packs and patch sets. Prerequisite for the installation of the service packs is at least version P6 EPPM R21.12.0 or higher.

The patch set is certified for the JDK 1.8.0_311 Further supported JDK versions can be found in the Tested Configurations.

Version

Component

Bug ID

Title

21.12.11.0

WEB

34731405

UPGRADING P6 EPPM DATABASE FROM R20.12.12.0 WILL FAIL WITH "THERE IS NO VALUE DEFINED TO SUBSTITUTE FOR VERSION"

34715047

INTERNAL-FP:RESOURCE ANALYSIS HISTOGRAM LOADS INCORRECT CODE

34715039

INTERNAL-FP:APPLY ACTUAL JOB FAILURE (JAVA.LANG.NULLPOINTEREXCEPTION) WHEN RESOURCE ASSIGNED TO IN-PROGRESS ACTIVITY HAS MANUAL CURVE WHERE TASKRSRC.TARGET_CRV IS NULL

34663952

COLUMN OPTIONS ARE NOT TRANSLATED INTO THE FRENCH LANGUAGE

34663909

NOT ALL PROJECT CODES DOWNLOADED TO EXCEL

34662600

USERS INTERMITTENTLY EXPERIENCE THE UNABLE TO LOAD DATA WHEN LOADING PROJECTS

34658170

FP PROJECTS WITH IDENTICAL PROJECT NAMES ARE NOT ABLE TO BE ADDED TO SUMMARIZATION SCHEDULED SERVICE

34650248

UPPER FUNCTION NEEDLESSLY ADDED TO PROJECT/ASSIGNMENT PAGE CUSTOM FILTER PROJECT STATUS COLUMN

34616780

FILL DOWN FROM ACTIVITIES VIEW RESULTS IN ERROR UNABLE TO SAVE CHANGES: FAILED SAVING DATA. USER XXXX DOES NOT HAVE THE SECURITY PRIVILEGE TO EDIT THE ACTIVITY ID

34314353

THE VALUE ENTERED FOR ROLE NAME MUST BE UNIQUE

SRVS

34688619

FP INVOKING IMPORTSERVICE OPERATION WILL RESULT IN ILLEGAL CHARACTER WHEN PROJECT DATA INCLUDES AN ASCII CONTROL CHARACTER

34755361

LOADING ACTIVITY CODE TYPES FOR NON-ADMIN SUPER USERS NO LONGER WORKING WITH P6 WS

34740155

THE REQUEST PARAMETERS ARE MISSING FROM THE DOCUMENTATION FOR CALENDARS

34688692

FP RESOURCEHOUR SOAP SERVICE ACCEPTING APPROVEDHOURS & APPROVEDOVERTIMEHOURS WITH THE UPDATERESOURCEHOURS OPERATION

P6PRO

34618856

FP PROBLEM SUMMARIZING SUMMARYTASKSPREAD DATACAUSED BY: ERROR CALCULATING START DATE

34703746

REVISION DATE IN THE PAGE LAYOUT FOOTER IS NOT POPULATED AFTER UPGRADE

34703398

ACTIVITY RELATIONSHIPS EXPORT TO XLSX DISPLAYS SOME FIELDS IN HOURS

34703377

EVENT CODE ET'EP-0811-1 ATTEMPTING XML FILE DOWNLOAD OF WHEN PROJECT NAME INCLUDES UNICODE CHARACTERS AND WINDOWS LOCALE SET TO JAPANESE

34703345

USING THE COMMAND LINE TO EXPORT BATCH REPORTS FAILS IF A DUPLICATE PROJECT IS ENTERED IN THE ACTIONS.CONFIG

34703330

CANNOT ADD RELATIONSHIP BETWEEN 2 ACTIVITIES OF 2 DIFFERENT PROJECTS

34693901

PREDECESSOR/SUCCESSOR LIST IN TASK SPREADSHEET OF AN EXPORTED EXCEL FILE MISSES DATA

34676575

CTRL+R (FILL ACROSS) KEYBOARD SHORTCUT DOES NOT WORK

34715054

INTERNAL-FP:RESOURCE ANALYSIS HISTOGRAMS SHOWS ALL PROJECTS IN THE LEGEND, EVEN THOSE NOT ENABLED FOR PUBLICATION

34694495

ISSUE IN IMPORTING PROJECTS IN P6

proadvise GmbH l Brühlweg 4 l 73663 Berglen

Newsletter

Register here for our newsletter and secure your knowledge advantage!

Register now

Copyright © 2020 proadvise.com - All rights reserved.
Design and programming webart-IT UG (haftungsbeschränkt)