Patch Set 7 for Oracle Primavera P6 EPPM R20.12

Patch Set 7 for Oracle Primavera P6 EPPM R20.12

| released in Support

Patch set 7 for Oracle Primavera P6 EPPM R20.12 is available for download from My Oracle Support. The patch set contains the patches from the previous service packs and patch sets. Prerequisite for the installation of the service packs is at least version P6 EPPM R20.12.0 or higher.

The patch set is certified for the JDK 1.8.0_271 Further supported JDK versions can be found in the Tested Configurations.

Version

Component

Bug ID

Title

20.12.7.0

WEB

33053293

OAS :REPORT GENERATION ARE GETTING FAILED

33041114

THE PROJECT ARBITER FAILS AT 3:00 AM DAILY

33029042

BP-ON DELETING CODES/UDF/STEPS NOT DELETED FOR PUBLISED X TABLES

32988267

MISSING CAPTION IN APPLICATION SETTINGS FOR AUDITING

32982399

CLASSIC VIEW MIGRATION FAILED WITH ERRORS

32963106

DATA GETS PUBLISHED IN TO CHGMEMOX TABLE FOR ALL THE PROJECTS THOUGH ONLY SINGLE PROJECT IS PUBLISHED.

32958239

THE USER LOGIN REPORT SHOWS DIFFERENT VALUES UNDER APP_NAME SINCE UPGRADING TO V20.12.4

32936422

WHEN SWITCHING BETWEEN SECURITY PROFILES THE LOWER PERMISSIONS PANE ALSO CHANGES

32877925

20 FP - SQLSERVER: FILTER CRITERIA NOT DISPLAYING PROJECTS WHEN THE NUMBER OF EPS/PROJECTS EXCEEDS MAX SETTING

32876372

WHEN CREATING A NEW GLOBAL DASHBOARD FILTER,USERS RECEIVE THE ERROR: AN ERROR OCCURRED WHILE PROCESSING YOUR REQUEST.

31721941

VIEW SERVICE STATUS IMPORT JOB PROJECTS COLUMN SHOWING IMPORTING EPS NAME

32973049

P6 WEB SERVICES XML EXPORT FAILS WITH: FIELD FINANCIALPERIODTEMPLATEID HAS NOT BEEN LOADED OR SET.

32983183

ACTUALTHISPERIODCOST SET TO LARGE NEGATIVE VALUE WHEN CREATING NEW RESOURCEASSIGNMENTS

33012838

PRIMAVERA P6 IN AZURE - EXPORT PROJECT TO MICROSOFT PROJECT XML IS SLOW

32894598

VALIDATE.BAT, DATABASELOGIN.BAT & DBSETUP.BAT USING SSL PORT GOT ERROR : SQLRECOVERABLEEXCEPTION: IO ERROR: NO APPROPRIATE PROTOCOL ( PROTOCOL IS DISABLED OR CIPHER SUITES ARE INAPPROPRIATE), AUTHENTICATION LAPSE 0 MS

33001533

NEED TO REMOVE DROP SCRIPT IN GET_TASK_CODE_FOR_COPYWBS MSSQL PROCEDURE

32967352

AFTER EPPM UPGRADE FROM V.18.8 TO 20.12 USERS CANNOT COPY WBS COPY WBS FROM TEMPLATE WHEN PROJECT STATUS IS INACTIVE

32929634

COPY WBS FAILED WHEN COPYING A WBS FROM ANY PROJECT OR PROJECT TEMPLATE

P6PRO

33038664

P6 HANGS FOR MINUTES WHEN REFRESHING AFTER SUMMARIZING A PROJECT

32996852

TOTAL ACTIVITY COUNT IN WBS VIEW NOT UPDATED CORRECTLY

32976471

WHILE SWITCHING FROM THE ACTIVITIES VIEW TO WBS VIEW, THE WBS SELECTED IN WBS VIEW IS NOT UPDATED

32801608

IMPORT XML PROCESS COMPLETED SUCCESSFULLY BUT NO PROJECT AND ERROR IN LOG

31514547

IN VISUALIZER TSLD LAYOUT FINISH DATE FILTERS ARE NOT WORKING AS EXPECTED

33030789

LOADING DATA SUMMARY AFTER MANUAL SUMMARIZATION IS TAKING A LONG TIME

32988936

PLANNED VALUE COST DIFFERS IN THE ACTIVITY USAGE SPREADSHEET AND THE ACTIVITY TABLE

32739773

??INCORRECTRESULTSIZEEXPECTED1ACTUAL0?? INCORRECT RESULT SIZE: EXPECTED 1, ACTUAL 0 WHEN ATTEMPTING TO SAVE A COPY OF THE CURRENT SCHEDULE AS A NEW BASELINE

30505276

THE DATE ADDED IS TODAY'S DATE AND ADDED BY IS SYMON(BG)

32975530

BP - STORED IMAGES CANNOT LOAD AFTER MIGRATING DATABASE

proadvise GmbH l Brühlweg 4 l 73663 Berglen

Newsletter

Register here for our newsletter and secure your knowledge advantage!

Register now

Copyright © 2020 proadvise.com - All rights reserved.
Design and programming webart-IT UG (haftungsbeschränkt)