Patch Set 14 for Oracle Primavera P6 EPPM R22.12 is available for download from My Oracle Support. The patch set contains the patches from the previous service packs and patch sets. Prerequisite for the installation of the service packs is at least version P6 EPPM R22.12.0 or higher.

The patch set is certified for the JDK 1.8.0_311 Further supported JDK versions can be found in the Tested Configurations.

Version

Component

Bug ID

Title

22.12.14.0

WEB

36387627

UNABLE TO SAVE AND APPLY CHANGES IN P6 WEB RESOURCE ASSIGNMENTS VIEWS

36382348

FP JOBSVC.JOB_TYPE='JT_COLLABSYNC' ROWS CREATED DURING COPY/PASTE FOR PROJECTS WITHOUT CR DOCS ARE NEVER DELETED FROM TABLE

36352325

SEARCH IN EPS FOR CENTER RETURNS PROJECTS WITH INDICATOR SELECTED UNDER CENTRALLY XXX

36333651

GLOBAL SEARCH & REPLACE ERRONEOUSLY THROWS ERROR - NO DATA TO BE REPLACED

TM

36388238

TEAM MEMBER REFRESH STAYS ON SUBORDINATE TIMESHEET

35768393

TEAM MEMBER FAILED TO LOAD

SRVS

36410023

[BACKPORT] PUBLISH SECURITY GLOBAL SCHEDULED SERVICE NOT UPDATING COST FLAG FOR NON-GLOBAL SUPERUSERS WHEN SECURITY PROFILE CHANGES ALLOW OR DISALLOW ABILITY TO VIEW COST

36324975

GETTING AN HEX CHARACTER CODE IN STRINGS INSTEAD OF ITS SYMBOL

36316397

P6 WEB SERVICE SPEAD SERVICE READACTIVITYORASSIGNMENTSPREADZIP OPERATION NOT RETURNING CUMULATIVE FIELDS

36390239

[BACKPORT] EXCEPTION EXECUTING COPY_ACTIVITY_BATCH FOR TASKPRED, REASON: INCORRECT SYNTAX NEAR THE KEYWORD 'AND' WHEN COPY/PASTING A LARGE VOLUME OF PROJECTS WITH ACTIVITY RELATIONSHIP OPTION ONLY BETWEEN COPIED ACTIVITIES SELECTED

36351973

UPDATE EXISTING PROJECT VIA XML IMPORT WILL IMPROPERLY CALCULATE REMAINING LAG FOR RESOURCE ASSIGNMENT WHEN ACTIVITY WILL BE SET TO COMPLETED STATUS IF ASSIGNED CALENDAR ALSO CHANGES WITH UPDATE AND EXISTING ASSIGNMENT HAD REMAINING LAG

P6PRO

36395180

WHEN MULTIPLE USERS COPY/PASTE ONLY ONE NEW ACTIVITY IS CREATED

36159805

ROW HEIGHT IS NOT BEING RETAINED AFTER CLOSING AND OPENING THE LAYOUT

36114400

PROJECT CHECKER - ERROR: MILESTONE ACTIVITIES WITH UNITS

36202086

SCHEDULE COMPARISON / VISUALIZER DOES NOT WORK WITH SQL SERVER DATABASE

proadvise GmbH l Brühlweg 4 l 73663 Berglen

Newsletter

Register here for our newsletter and secure your knowledge advantage!

Register now

Copyright © 2020 proadvise.com - All rights reserved.
Design and programming webart-IT UG (haftungsbeschränkt)